3 records found.
Year: 1983 | Article #: 8
8. To see if the Town will vote to withdraw Nine Thousand Five Hundred dollars ($9,500.00) from the Road Maintenance Capital Reserve Fund Interest to be expended for maintenance of and repairs to the Flood Control Basin roads and South Road Bridge and Peter's Bridge. (Included in the Budget)...
Year: 1977 | Article #: 12
12. To see if the Town will vote to raise and appropriate the sum of $12,195.00 for repairs to South Road Bridge, so-called; and, to further authorize the Selectmen to withdraw the sum of $12,195.00 from the Capital Reserve Fund for Maintenance of Roads in the Flood Control Basin for this purpose....
Year: 1961 | Article #: 14
14. To see if the Town will authorize the selectmen to withdraw sum of $5,000.00 from the accumulated interest of Capital Reserve Fund to reinforce South Road and Pingree bridges....